Bathroom remodeling
Bathrooms that stay dry, stay clean, and stay finished
From a refresh to a full gut renovation, including tile, fixtures, and walk-in showers.

Overview
About our bathroom remodeling
Most bathroom failures trace back to what happens before the tile goes on. We build waterproofing, slope, and ventilation correctly the first time, then finish with the tile and fixtures you picked — so the room still looks new in year eight.
What's included
- Full gut renovations and targeted refreshes
- Curbless and low-curb walk-in showers
- Bonded waterproofing systems and proper pan slope
- Freestanding tubs and tub-to-shower conversions
- Floating, furniture-style, and double vanities
- Exhaust ventilation sized to the room
- Accessible layouts, grab-bar blocking, and comfort-height fixtures
Selected work
Bathroom remodeling projects
A sample of what this work looks like once it's finished.

Margate
Primary bath with curbless walk-in shower

Coral Springs
Guest bath gut renovation

Coral Springs
Open-concept kitchen with waterfall island
Free estimate
Planning a bathroom project?
Five quick questions. We'll come out, measure, and put a written, itemised estimate in your hands — at no cost.
Or call (561) 300-0607
Free estimate
01 / 05
Questions
Common questions
Reach out to schedule a consultation. We'll discuss your goals, assess your space, and walk you through what's realistic for the layout and the budget. You'll get a detailed written estimate before any commitment.
Yes. Consultations and written estimates are free. The estimate breaks out labor, materials, and allowances so you can see exactly where the money goes.
A bathroom usually runs three to five weeks, a kitchen six to ten, and a whole-home renovation two to four months depending on scope and permitting. We give you a schedule with milestones before we start.
Yes — we're a licensed and insured general contractor serving Broward, Palm Beach, Martin, St. Lucie, and Indian River counties. We pull permits for all work that requires them and carry both liability and workers' compensation coverage.
For most single-room projects, yes. We set up dust containment and protect walkways, and we phase whole-home work so you keep a functioning kitchen or bathroom wherever it's possible.
We do. Permitting, scheduling inspections, and closing out the permit at the end are all part of the job — an open permit can hold up a future home sale, so we make sure it gets finalized.
